Reload air conditioners system 2004

الأحد، 3 يوليو 2016
  Reload air conditioners system 2004


The most a la mode remodel of the mechanical frameworks of Scaife Corridor was done in 2004. The HVAC frameworks for the cellar and the principal floor were completely upgraded and for the second to fourth floor, fashioners changed the current channels, funnels and diffusers by revamping them. After remodel in 2004, molded air for the storm cellar and the main floor originates from air taking care of units situated in the mechanical room with a warmth recuperation framework while the penthouse is in charge of the second to fourth floor spaces. 

Specifically, the second to fourth floor stayed every one of the elements of remodel in 1995 aside from a few changes in the dispersion of conduits and diffusers. In any case, for the storm cellar, an aggregate five warm units were included, which brought about the change of funnels and channels correspondingly. Concerning the principal floor, a story plenum air supply coupling with a roof plenum air return framework were presented. 

It is likewise prominent that the air supplied by the conduit is only for ventilation reason and fan loop units assume liability to embrace the warm loads. The motivation behind why ventilation work were once in a while covering and excessively complex is that originators might want to use the old ventilation work to diminish cost. Likewise, there is no ventilation in the stairwell territories.

ليست هناك تعليقات:

إرسال تعليق

 
All rights reserved © anaqa-central-aircondition
Supervision: Market Sailor